AVG. 21 DAYS FROM SURVEY TO INSTALLATION
01
Survey & Measure
Our team surveys the site in person; measurements, ground and wind-load analysis reported free of charge.
1 DAY / FREE
02
Design & Engineering
The system is engineered on a 3-D model of your space; you see what you get before you approve.
3–5 DAYS
03
Production
Aluminium profiles are machined with CNC precision in our own facility and sealed with electrostatic paint.
7–14 DAYS
04
Installation & Handover
Our own installation crew completes the setup, commissions the system and trains you on site.
1–2 DAYS + WARRANTY